electric construction entrance drop riser weatherhead installation

Entrance Requirements

A.    Only one service drop, either overhead or underground, will be supplied to a residential unit, building or other structure without the approval of the Engineering Manager of PES and the inspection authority.

B.    Any occupancy requiring service of 600 amperes or less, not exceeding 500 volts, single or three-phase overhead or underground, shall use self-contained metering.  Express permission to have current transformer metering shall be granted only by the Engineering Manager of PES.  

Syndicate content